Part #1:
- City: Jacobsdorf
- Commissioning:

- 2 turbines: Vestas V150/5.6MW (power 5 600 kW, diameter 150 m)
- Hub height:

- Total nominal power: 11,200 kW
- Operational
- Onshore wind farm
- Operator: MLK Windpark
- Source:

Part #2:
- City: Jacobsdorf
- Commissioning:

- 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: MLK Windpark
- Source:

Part #3:
- Part: Erweiterung
- City: Jacobsdorf
- Commissioning:

- 1 turbine: Vestas V150/5.6MW (power 5 600 kW, diameter 150 m)
- Hub height:

- Total nominal power: 5,600 kW
- Operational
- Onshore wind farm
- Operator: MLK Windpark
- Source:

Part #4:
- Part: Odervorland
- City: Jacobsdorf
- Commissioning:

- 1 turbine: Siemens SWT-2.3-93 (power 2 300 kW, diameter 93 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: MLK Windpark
- Source:

Part #5:
- Part: Odervorland
- City: Jacobsdorf
- Commissioning:

- 1 turbine: Siemens SWT-2.3-93 (power 2 300 kW, diameter 93 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: MLK Windpark
- Source:

Localisation
Part #1:
- Latitude: 52° 21' 25.4"
- Longitude: 14° 22' 8.8"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 21' 2.6"
- Longitude: 14° 19' 39.5"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Erweiterung
- Latitude: 52° 21' 25.4"
- Longitude: 14° 22' 8.8"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
Part #5:
Update for this sheet: 9 February 2026