[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 10 turbines: Nordex N175/6.X (power 6 220 kW, diameter 175 m)
- Total nominal power: 68,000 kW (uprated turbines)
- Operational
- Onshore wind farm
- Developer: UKA Group
Localisation
No data.
Update for this sheet: 6 April 2026