[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Barmainville, Oinville-Saint-Liphard, Rouvray-Saint-Denis, Neuvy-en-Beauce
- Commissioning:

- 5 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 10,000 kW
- Dismantled (2026)
- Onshore wind farm
- Developers: Futuren/Boralex
- Source:

Part #2:
- City: Barmainville, Oinville-Saint-Liphard, Rouvray-Saint-Denis, Neuvy-en-Beauce
- 3 turbines: Vestas V150/4.5MW (power 4 500 kW, diameter 150 m)
- Hub height:

- Total nominal power: 13,500 kW
- Under construction
- Onshore wind farm
- Developer: Boralex
Localisation
Part #1:
Part #2:
Update for this sheet: 10 May 2026