[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Seglaberga IV
- City: Laholm
- Commissioning:

- 1 turbine: Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Developer: Södra Hallands Kraftförening
Production forecast
- From Friday, January 22 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 75 %
- Expected production: 9,010 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Seglaberga V
- City: Laholm
- Commissioning:

- 1 turbine: Vestas V44/600 (power 600 kW, diameter 44 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developer: Södra Hallands Kraftförening
Production forecast
- From Friday, January 22 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 78.4 %
- Expected production: 11,290 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Seglaberga IV
- Latitude: 56° 32' 12.5"
- Longitude: 13° 2' 38"
- Altitude: 30 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Seglaberga V
- Latitude: 56° 32' 12.5"
- Longitude: 13° 2' 38"
- Altitude: 30 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 16 December 2020
Complete/correct this sheet: