The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > La Montagne ardéchoise (France)


[Back to previous page]

France wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • Part: Cham de Cham Longe 2
  • City: Saint-Étienne-de-Lugdarès, Astet, Cham de Longe
  • Commissioning: 2010/02
  • 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Hub height: 65 m
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm
  • Developers: Sofiva/Elys
  • Operator: Boralex
  • Owner: Boralex
  • Source: https://www.boralex.com/fr/nos-sites-et-projets
  • Source: http://elys-energies.com/references/

       Production forecast

  • From Sunday, May 31 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.4 %
  • Expected production: 420 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • Part: Eole Cévennes
  • City: Saint-Étienne-de-Lugdarès, Astet, Cham de Longe
  • Commissioning: 2005/12
  • 6 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
  • Hub height: 64 m
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Sofiva
  • Operator: Boralex
  • Owner: Boralex
  • Source: https://www.boralex.com/fr/nos-sites-et-projets

       Production forecast

  • From Sunday, May 31 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.2 %
  • Expected production: 400 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • Part: Est
  • City: Saint-Étienne-de-Lugdarès
  • Commissioning: 2017/02
  • 8 turbines: Enercon E82/2350 (power 2 350 kW, diameter 82 m)
  • Hub height: 78 m
  • Total nominal power: 18,800 kW
  • Operational
  • Onshore wind farm
  • Developers: Ecovent/EDF renewables/Elys
  • Operator: EDF renewables
  • Owner: EDF renewables
  • Source: https://www.edf-energies-nouvelles.com/wp-content/uploads/DP_projet_eolien_Montagne_Ardechoise.pdf
  • Source: http://elys-energies.com/references/

Part #4:

  • Part: Moulins de Bel Air
  • City: Saint-Étienne-de-Lugdarès, Astet, Cham de Longe
  • Commissioning: 2005/12
  • 6 turbines: GE Energy 1.5s (power 1 500 kW, diameter 70.5 m)
  • Hub height: 64 m
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Sofiva
  • Operator: Boralex
  • Owner: Boralex
  • Source: https://www.boralex.com/fr/nos-sites-et-projets

       Production forecast

  • From Sunday, May 31 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 0.2 %
  • Expected production: 460 kWh
  • Values from Weathernews Windcaster solution

Part #5:

  • Part: Nord
  • City: Saint-Étienne-de-Lugdarès
  • Commissioning: 2017/02
  • 8 turbines: Enercon E82/3000 (power 3 000 kW, diameter 82 m)
  • Hub height: 85 m
  • Total nominal power: 24,000 kW
  • Operational
  • Onshore wind farm
  • Developers: Ecovent/EDF renewables/Elys
  • Operator: EDF renewables
  • Owner: EDF renewables
  • Source: https://www.edf-energies-nouvelles.com/wp-content/uploads/DP_projet_eolien_Montagne_Ardechoise.pdf
  • Source: http://elys-energies.com/references/

Part #6:

  • Part: Sud
  • City: Saint-Étienne-de-Lugdarès
  • Commissioning: 2017/02
  • 13 turbines: Enercon E82/2350 (power 2 350 kW, diameter 82 m)
  • Hub height: 78 m
  • Total nominal power: 30,550 kW
  • Operational
  • Onshore wind farm
  • Developers: Ecovent/EDF renewables/Elys
  • Operator: EDF renewables
  • Owner: EDF renewables
  • Source: https://www.edf-energies-nouvelles.com/wp-content/uploads/DP_projet_eolien_Montagne_Ardechoise.pdf
  • Source: http://elys-energies.com/references/

Localisation


Part #1:

  • Part: Cham de Cham Longe 2
  • Latitude: 44° 39' 50.5"
  • Longitude: 4° 0' 42.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Part: Eole Cévennes
  • Latitude: 44° 39' 50.5"
  • Longitude: 4° 0' 42.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Part: Est
  • Latitude: 44° 44' 17"
  • Longitude: 4° 1' 2.1"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Part: Moulins de Bel Air
  • Latitude: 44° 40' 7.5"
  • Longitude: 3° 59' 48.7"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #5:

  • Part: Nord
  • Latitude: 44° 45' 24"
  • Longitude: 3° 56' 4"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #6:

  • Part: Sud
  • Latitude: 44° 39' 33.8"
  • Longitude: 3° 55' 40.1"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 14 April 2020
Complete/correct this sheet:



The Wind Power
contact@thewindpower.net
All rights reserved - 2005-2020

General Terms and Conditions of Sale - Partners
NEWSLETTER