- City: Luckenwalde
- Commissioning:

- 1 turbine: Vestas V82/1500 (power 1 500 kW, diameter 82 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Saturday, January 23 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 5.1 %
- Expected production: 1,850 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 52° 6' 35.9"
- Longitude: 13° 7' 48"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view