Generalities

PDF

Details


Part #1:

  • City: Edemissen
  • Commissioning: 2005/10
  • 1 turbine: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom
  • Source: http://www.windstrom.de/list-view.html

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 11.4 %
  • Expected production: 5,460 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Edemissen
  • Commissioning: 2001
  • 5 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
  • Total nominal power: 6,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom
  • Source: http://www.windstrom.de/list-view.html

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 7.3 %
  • Expected production: 11,380 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Edemissen
  • Commissioning: 2005/11
  • 5 turbines: Bonus B82/2300 (power 2 300 kW, diameter 82.4 m)
  • Total nominal power: 11,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom
  • Source: http://www.windstrom.de/list-view.html

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 8.6 %
  • Expected production: 23,740 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Edemissen
  • 13 turbines: (manufacturer name not available)
  • Total nominal power: 27,600 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom
  • Source: http://www.windstrom.de/list-view.html

       Production forecast

  • From Wednesday, September 27 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 7.8 %
  • Expected production: 51,990 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Update for this sheet: 21 September 2017
Complete/correct this sheet: