[Back to previous page]
Details
Part #1:
- City: Schkölen
- Commissioning:

- 3 turbines: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5 %
- Expected production: 2,140 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Alfstedt
- Commissioning:

- 3 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, July 03 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.9 %
- Expected production: 1,780 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Alfstedt
- Commissioning:

- 1 turbine: Tacke TW-600 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 600 kW
- Dismantled
- Onshore wind farm
Part #4:
- City: Alfstedt
- Commissioning:

- 1 turbine: Enercon E101/3000 (power 3 000 kW, diameter 101 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 53° 33' 19.8"
- Longitude: 9° 3' 15.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 33' 28.6"
- Longitude: 9° 3' 26.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 53° 33' 19.8"
- Longitude: 9° 3' 15.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 53° 33' 36.4"
- Longitude: 9° 3' 17.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 23 October 2018
Complete/correct this sheet: