Part #1: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 
Part #3: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Dewind D4-500 (power 500 kW, diameter 41 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 - Developer: MLK Consulting
 
Part #4: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 - Developer: MLK Consulting
 
Part #5: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 - Developer: F&F Naturkraft Franken
 
Part #6: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 
Part #7: 
- City: Hallschlag
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 500 kW
 - Dismantled (2020/12)
 - Onshore wind farm
 
Part #8: 
- City: Scheid
 - Commissioning: 

 - 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,300 kW
 - Operational
 - Onshore wind farm
 
Part #9: 
- City: Ormont
 - Commissioning: 

 - 1 turbine: Enercon E58/1000 (power 1 000 kW, diameter 58 m)
 - Hub height: 

 - Total nominal power: 1,000 kW
 - Operational
 - Onshore wind farm
 
Part #10: 
- City: Ormont
 - Commissioning: 

 - 2 turbines: Enercon E58/1000 (power 1 000 kW, diameter 58 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 50° 19' 30.9"
 - Longitude: 6° 27' 47.9"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 50° 20' 27.9"
 - Longitude: 6° 25' 15.6"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
- Latitude: 50° 20' 33"
 - Longitude: 6° 25' 46.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
- Latitude: 50° 20' 39"
 - Longitude: 6° 25' 46.1"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
- Latitude: 50° 12' 6.1"
 - Longitude: 6° 15' 6.4"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #6: 
- Latitude: 50° 20' 42.9"
 - Longitude: 6° 25' 25.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #7: 
- Latitude: 50° 20' 21.5"
 - Longitude: 6° 25' 14.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Latitude: 50° 21' 2.7"
 - Longitude: 6° 24' 27.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #9: 
- Latitude: 50° 19' 31.8"
 - Longitude: 6° 26' 35.7"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #10: 
- Latitude: 50° 19' 31.8"
 - Longitude: 6° 26' 35.7"
 - Geodetic system: WGS84
 - Precise localization: no
 