Wind farms
Brandenkopf (Germany)| Brandenkopf (Germany) |
|
| Operational (1,6 MW) |

| Country | Germany |
| County/Zone | Baden-Württemberg |
| City | Fischerbach - Oberharmersbach |
| Wind farm type | Onshore wind farm |

![]() | 1 MW commissioned |
![]() | 0.6 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Tacke TW-600e (x 1) |
| Operational | Enercon E58/1000 (x 1) |

![]() | |

| City | Fischerbach |
| Commissioning | ![]() |
| Turbine | 1x Enercon E58/1000 (power 1,000 kW, diameter 58 m) |
| Hub height | ![]() |
| Total nominal power | 1,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 48° 20' 20.8" - Longitude 8° 8' 54.3" |
| Altitude | 900 m |
| Precise localization | Yes |
| Part | Jalbo |
| City | Oberharmersbach |
| Commissioning | ![]() |
| Turbine | 1x Tacke TW-600e (power 600 kW, diameter 46 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Coordinates | Latitude 48° 20' 22.9" - Longitude 8° 9' 17.3" |
| Altitude | 900 m |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Nillkopf (2 km) Hohenlochen (4 km) Füllebel (12 km) Bad Rippoldsau - Schapbach (12 km) Teuscheneck (12 km) Hornberg Pilfer (13 km) Raukasten-Steinfirst (13 km) Prechtaler Schanze II (13 km) Prechtaler Schanze I (13 km) Gengenbach (13 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Baden-Württemberg : 2,108.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 18 May 2022 |
||