[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Recklinghausen
- Commissioning:

- 2 turbines: Tacke TW-300 (power 300 kW, diameter 33 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Production forecast
- From Friday, June 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.6 %
- Expected production: 660 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Recklinghausen
- Commissioning:

- 4 turbines: Enercon E58/1000 (power 1 000 kW, diameter 58 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: SL Windenergie
- Operator: SL Windenergie
- Owner:

- Source:

Production forecast
- From Friday, June 2 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.2 %
- Expected production: 6,940 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Oer-Erkenschwick
- Commissioning:

- 1 turbine: Senvion 3.2M122 (power 3 200 kW, diameter 122 m)
- Hub height:

- Total nominal power: 3,200 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 37' 16.5"
- Longitude: 7° 15' 57.6"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 51° 38' 11.4"
- Longitude: 7° 12' 53.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 37' 31.4"
- Longitude: 7° 16' 9.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 September 2022
Complete/correct this sheet: