			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Obere Warnow
 - Commissioning: 

 - 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,000 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Grebbin
 - Commissioning: 

 - 2 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 1,000 kW
 - Dismantled
 - Onshore wind farm
 
Part #3: 
- City: Obere Warnow
 - Commissioning: 

 - 4 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 8,000 kW
 - Operational
 - Onshore wind farm
 - Operator: RWE
 - Owner: 

 
Part #4: 
- City: Grebbin
 - Commissioning: 

 - 5 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Total nominal power: 11,500 kW
 - Operational
 - Onshore wind farm
 - Developer: WPD
 - Operator: WPD
 - Source: 

 
Part #5: 
- City: Obere Warnow
 - Commissioning: 

 - 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 - Developer: WPD
 - Source: 

 
Part #6: 
- City: Grebbin
 - Commissioning: 

 - Turbine(s): Enercon E40/500 (power 500 kW, diameter 40 m)
 - Hub height: 

 - Dismantled
 - Onshore wind farm
 
Localisation
Part #1: 
- Latitude: 53° 30' 8.6"
 - Longitude: 11° 52' 5.8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #2: 
- Latitude: 53° 30' 5.8"
 - Longitude: 11° 52' 5.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
Part #4: 
Part #5: 
Part #6: 
- Latitude: 53° 30' 5.8"
 - Longitude: 11° 52' 5.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 0  