[Back to previous page]
Generalities
|
|
Details
Part #1:
Production forecast
- From Thursday, March 23 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 97.9 %
- Expected production: 46,500 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Arnstein
- Commissioning:

- 2 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developers: Prokon/SAB WindTeam GmbH
- Operator: Prokon
- Owner:

- Source:

- Source:

Production forecast
- From Thursday, March 23 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 51.4 %
- Expected production: 49,330 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Arnstein
- Commissioning:

- 4 turbines: GE Energy 1.5sl (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: e.n.o. Energy
- Operator: e.n.o. Energy
Production forecast
- From Thursday, March 23 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 97.9 %
- Expected production: 140,920 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 40' 51.7"
- Longitude: 11° 28' 34.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 40' 45.5"
- Longitude: 11° 29' 7.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 41' 21.5"
- Longitude: 11° 28' 29.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 22 November 2022
Complete/correct this sheet: