[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: Distripark
- City: Waddinxveen
- Commissioning:

- 2 turbines: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Raedthuys
- Operator: Pure Energie
- Owner:

- Source:

- Source:

Production forecast
- From Tuesday, September 26 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 23.8 %
- Expected production: 34,260 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Distripark
- City: Waddinxveen
- Commissioning:

- 1 turbine: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Raedthuys
- Operator: Pure Energie
- Owner:

- Source:

- Source:

Production forecast
- From Tuesday, September 26 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 7.3 %
- Expected production: 5,280 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Distripark
- City: Waddinxveen
- Commissioning:

- 1 turbine: Vestas V90/3000 (power 3 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: Raedthuys
- Operator: Pure Energie
- Owner:

- Source:

- Source:

Localisation
Part #1:
- Part: Distripark
- Latitude: 52° 1' 55.8"
- Longitude: 4° 30' 8.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Distripark
- Latitude: 52° 1' 56"
- Longitude: 4° 29' 59.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Part: Distripark
- Latitude: 52° 1' 55.8"
- Longitude: 4° 30' 8.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures

Author: Jérôme Fernandez - License: All right reserved
Picture reference: 10494 - Date: 2012
Update for this sheet: 18 August 2023
Complete/correct this sheet: