Generalities
|
|
Details
Part #1:
- City: Vorwerk
- Commissioning:

- 2 turbines: Enercon E53/800 (power 800 kW, diameter 52.9 m)
- Hub height:

- Total nominal power: 1,600 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, March 03 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 9.8 %
- Expected production: 3,750 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Ottersberg
- Commissioning:

- 1 turbine: Enercon E126/4200 (power 4 200 kW, diameter 127 m)
- Hub height:

- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, March 03 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 9.6 %
- Expected production: 9,710 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 8' 53"
- Longitude: 9° 5' 26.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 53° 8' 53"
- Longitude: 9° 5' 26.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 October 2020
Complete/correct this sheet: