[Back to previous page]
Details
Part #1:
- City: Niedergörsdorf
- Commissioning:

- 6 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
- Developer: Winkra
- Operator: RWE
- Owner:

Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.3 %
- Expected production: 3,300 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Niedergörsdorf
- Commissioning:

- 4 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 7,200 kW
- Operational
- Onshore wind farm
- Developer: Winkra
- Operator: RWE
- Owner:

Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.2 %
- Expected production: 360 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Niedergörsdorf
- Commissioning:

- 2 turbines: Vestas V126/3450 (power 3 450 kW, diameter 126 m)
- Hub height:

- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
- Operator: Encavis
- Owner:

- Source:

Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.9 %
- Expected production: 1,480 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Niedergörsdorf
- Commissioning:

- 18 turbines: Enercon E40/600 (power 600 kW, diameter 40 m)
- Hub height:

- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
- Developer: Winkra
- Operator: RWE
- Owner:

Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.7 %
- Expected production: 4,440 kWh
- Values from Weathernews Windcaster solution
Part #5:
- City: Niedergörsdorf
- Commissioning:

- 1 turbine: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 660 kW
- Operational
- Onshore wind farm
Part #6:
- Part: Niedergörsdorf
- City: Treuenbrietzen
- Commissioning:

- 2 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: SKW Gemini GmbH & Co. KG
Production forecast
- From Sunday, June 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.6 %
- Expected production: 570 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 0' 40.2"
- Longitude: 12° 53' 28.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 0' 40.2"
- Longitude: 12° 53' 28.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 52° 0' 40.2"
- Longitude: 12° 53' 28.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 52° 0' 40.2"
- Longitude: 12° 53' 28.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #5:
- Latitude: 52° 0' 54.5"
- Longitude: 12° 53' 59.6"
- Geodetic system: WGS84
- Precise localization: no
Part #6:
- Part: Niedergörsdorf
- Latitude: 52° 0' 40.2"
- Longitude: 12° 53' 28.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 June 2022
Complete/correct this sheet: