Part #1:
- City: Achim
- Commissioning:

- 2 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, March 26 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 20.4 %
- Expected production: 19,550 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Hedeper
- Commissioning:

- 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Owner:

- Source:

Part #3:
Production forecast
- From Sunday, March 26 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 22.1 %
- Expected production: 26,280 kWh
- Values from Weathernews Windcaster solution
Part #4:
- Part: Achim-Embsen
- City: Achim
- Commissioning:

- 4 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developer: Dezentrale Energie
- Operator: Dezentrale Energie
- Owner:

- Source:

- Source:

Production forecast
- From Sunday, March 26 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 28.3 %
- Expected production: 54,390 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 1' 39"
- Longitude: 9° 4' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 1' 39"
- Longitude: 9° 4' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Achim-Borstel
- Latitude: 53° 1' 39"
- Longitude: 9° 4' 23.9"
- Geodetic system: WGS84
- Precise localization: no
Part #4:
- Part: Achim-Embsen
- Latitude: 53° 2' 40.2"
- Longitude: 9° 3' 14.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 27 June 2022