[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Ganderkesee
- Commissioning:

- 6 turbines: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:

- Total nominal power: 9,900 kW
- Operational
- Onshore wind farm
- Developer: Projekt GmbH
- Operator: Projekt GmbH
- Owner:

Production forecast
- From Monday, August 15 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 1.5 %
- Expected production: 3,680 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Ganderkesee
- Commissioning:

- 1 turbine: Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height:

- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, August 15 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 6.1 %
- Expected production: 1,240 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 53° 3' 44.3"
- Longitude: 8° 32' 43.2"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 53° 3' 37.6"
- Longitude: 8° 33' 10.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 12 July 2022
Complete/correct this sheet: