The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Achim (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • City: Achim
  • Commissioning: 2003/03
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 1,650 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, October 25 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 54.5 %
  • Expected production: 21,570 kWh
  • Values from Weathernews Windcaster solution

Part #2:

  • City: Achim
  • Commissioning: 2009/02
  • 2 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, October 25 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 49.3 %
  • Expected production: 47,360 kWh
  • Values from Weathernews Windcaster solution

Part #3:

  • City: Achim
  • Commissioning: 2009
  • 4 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Owner: Eurowind
  • Source: http://ewe.dk/DK/Referencer.aspx

Part #4:

  • Part: Achim-Borstel
  • City: Achim
  • Commissioning: 2002/12
  • 3 turbines: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
  • Hub height: 117 m
  • Total nominal power: 4,950 kW
  • Operational
  • Onshore wind farm
  • Developers: SeeBA EnergyFarming/Dezentrale Energie
  • Operator: Dezentrale Energie
  • Owner: Dezentrale Energie
  • Source: http://www.deangruppe.de/en/project-references-deangruppe.html?Page=1
  • Source: http://www.deag-energie.de/referenzen.html
  • Source: http://www.efiwind.de/index.php?id=118

       Production forecast

  • From Sunday, October 25 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 39.9 %
  • Expected production: 47,420 kWh
  • Values from Weathernews Windcaster solution

Part #5:

  • Part: Achim-Embsen
  • City: Achim
  • Commissioning: 2003/10
  • 4 turbines: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
  • Hub height: 60 m
  • Total nominal power: 8,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Dezentrale Energie
  • Operator: Dezentrale Energie
  • Owner: Dezentrale Energie
  • Source: http://www.deangruppe.de/en/project-references-deangruppe.html?Page=1
  • Source: http://www.deag-energie.de/referenzen.html

       Production forecast

  • From Sunday, October 25 2020, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 47.6 %
  • Expected production: 91,310 kWh
  • Values from Weathernews Windcaster solution

Localisation


Part #1:

  • Latitude: 53° 1' 39"
  • Longitude: 9° 4' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 53° 1' 39"
  • Longitude: 9° 4' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53° 1' 39"
  • Longitude: 9° 4' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Part: Achim-Borstel
  • Latitude: 53° 1' 39"
  • Longitude: 9° 4' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Part: Achim-Embsen
  • Latitude: 53° 2' 40.2"
  • Longitude: 9° 3' 14.1"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view


Update for this sheet: 19 February 2020
Complete/correct this sheet:



The Wind Power
contact@thewindpower.net
All rights reserved - 2005-2020

General Terms and Conditions of Sale - Partners
NEWSLETTER