[Back to previous page]
	
		
			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Norstedt
 - Commissioning: 

 - 4 turbines: Repower MM70 (power 2 000 kW, diameter 70 m)
 - Hub height: 

 - Total nominal power: 8,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Geo Mbh
 - Operator: Geo Mbh
 - Owner: 

 - Source: 

 
Part #2: 
- City: Norstedt
 - Commissioning: 

 - 6 turbines: Senvion 3.2M114 (power 3 200 kW, diameter 114 m)
 - Hub height: 

 - Total nominal power: 19,200 kW
 - Operational
 - Onshore wind farm
 - Developer: Geo Mbh
 - Source: 

 
Part #3: 
- City: Norstedt
 - Commissioning: 

 - 1 turbine: Repower MM82 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Norstedt
 - Commissioning: 

 - 1 turbine: Enercon E138/4200 (power 4 200 kW, diameter 138.25 m)
 - Hub height: 

 - Total nominal power: 4,200 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- Part: Norderfeld
 - City: Norstedt
 - Commissioning: 

 - 2 turbines: Repower MM82 (power 2 000 kW, diameter 82 m)
 - Hub height: 

 - Total nominal power: 4,000 kW
 - Operational
 - Onshore wind farm
 - Developer: Geo Mbh
 - Operator: Geo Mbh
 - Owner: 

 - Source: 

 
Localisation
Part #1: 
Part #2: 
Part #3: 
- Latitude: 54° 36' 43.5"
 - Longitude: 9° 8' 8"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #4: 
Part #5: 
Update for this sheet: 0  
Complete/correct this sheet: