Wind farms
Valdelacasa (Spain)| Valdelacasa (Spain) |
|
| Operational (10,8 MW) |

| Country | Spain |
| County/Zone | Leon (Castilla y Leon) |
| City | Quintana del Castillo - Villagatón-Branuelas |
| Wind farm type | Onshore wind farm |

![]() | 10.8 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V90/1800 (x 6) |

| No source available |

| Coordinates | Latitude 42° 38' 27.9" - Longitude -6° 6' 19.5" |
| Precise localization | No |
Databases ![]() Spain (59.9 GW) Europe (667.0 GW) World (2,494.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Valdelacasa III (4 km) Espina (8 km) Peña del Gato (9 km) Valdesamario (10 km) Valdelón (14 km) Valdelón Ampliación (14 km) El Manzanal (16 km) Argañoso (19 km) El Pedrón (25 km) El Redondal Fase 1 (28 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 464.9 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 28 August 2026 |
||