Wind farms
Kroningswind (Netherlands)| Kroningswind (Netherlands) |
|
| Operational (80 MW) |

| Country | Netherlands |
| County/Zone | Zuid-Holland |
| City | Dirksland |
| Wind farm type | Onshore wind farm |

![]() | 80 MW commissioned |

| Developers |
![]() ![]() ![]() |
| Operator |
![]() |
| Owners |
![]() #ND |
| Manufacturer |
|
| Site officiel | https://kroningswind.nl/ |

| Operational | Vestas V117/4000-4200 (x 19) |

![]() | |
![]() | |
![]() | |

| Hub height | ![]() |
| Total nominal power | 80,000 kW (uprated turbines) |
| Coordinates | Latitude 51° 47' 53.7" - Longitude 4° 4' 28.4" |
| Precise localization | Yes |
Databases ![]() Netherlands (19.6 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Haringvlietdam (5 km) Westhavendijk 11 (8 km) Pallandtpolder (10 km) Herkingen (10 km) Haringvliet Zuid (10 km) Dreischor (11 km) Martina Cornelia (12 km) Battenoert (13 km) Blaakweg (13 km) Suyderlandt (14 km) | ||
|
Insights Production capacity Netherlands : 11,792.0 MW (end of 2025) Zuid-Holland : 956.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 19 January 2026 |
||