Generalities
|
|
Details
Part #1:
- City: Mansfeld
- Commissioning:

- 3 turbines: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:

- Total nominal power: 4,950 kW
- Operational
- Onshore wind farm
- Developer: WKN AG
- Operators: WKN AG/BGZ
- Source:

- Source:

Production forecast
- From Friday, August 19 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 4.1 %
- Expected production: 4,830 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Mansfeld
- Commissioning:

- 1 turbine: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Windstrom
- Operator: Windstrom
- Owner:

- Source:

Production forecast
- From Friday, August 19 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 8.4 %
- Expected production: 4,050 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 7' 12.7"
- Longitude: 11° 25' 17.3"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 35' 41.4"
- Longitude: 11° 17' 11.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 0
Complete/correct this sheet: