Details
Part #1:
- City: Puls
- Commissioning:

- 10 turbines: Vestas V66/1650 (power 1 650 kW, diameter 66 m)
- Hub height:

- Total nominal power: 16,500 kW
- Operational
- Onshore wind farm
- Developer: WKN AG
- Operators: WKN AG/BGZ
- Source:

- Source:

Production forecast
- From Sunday, May 29 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 5.3 %
- Expected production: 21,090 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Christinenthal
- Commissioning:

- 1 turbine: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:

- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Developer: Wind Power Gmbh
- Owners:
/
Production forecast
- From Sunday, May 29 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 10.9 %
- Expected production: 5,380 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 54° 4' 17"
- Longitude: 9° 31' 58.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 54° 4' 17"
- Longitude: 9° 31' 58.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 31 October 2019
Complete/correct this sheet: