			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Laer
 - Commissioning: 

 - 2 turbines: Vestas V52/850 (power 850 kW, diameter 52 m)
 - Hub height: 

 - Total nominal power: 1,700 kW
 - Operational
 - Onshore wind farm
 
Part #2: 
- City: Nordwalde
 - Commissioning: 

 - 2 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 - Developer: WKN AG
 - Operator: Energiequelle
 - Source: 

 - Source: 

 
Part #3: 
- City: Nordwalde
 - Commissioning: 

 - 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
 - Total nominal power: 500 kW
 - Operational
 - Onshore wind farm
 
Part #4: 
- City: Nordwalde
 - Commissioning: 

 - 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
 - Hub height: 

 - Total nominal power: 600 kW
 - Operational
 - Onshore wind farm
 
Part #5: 
- City: Steinfurt
 - Commissioning: 

 - 1 turbine: Tacke  
 - Hub height: 

 - Total nominal power: 300 kW
 - Dismantled
 - Onshore wind farm
 
Part #6: 
- City: Steinfurt
 - Commissioning: 

 - 1 turbine: Enercon E115/3000 (power 3 000 kW, diameter 115.7 m)
 - Hub height: 

 - Total nominal power: 3,000 kW
 - Operational
 - Onshore wind farm
 
Part #7: 
- City: Laer
 - Commissioning: 

 - 3 turbines: (manufacturer name not available)  
 - Total nominal power: 21,000 kW
 - Operational
 - Onshore wind farm
 
Part #8: 
- City: Laer
 - Commissioning: 

 - 2 turbines: (manufacturer name not available)  
 - Total nominal power: 11,400 kW
 - Operational
 - Onshore wind farm
 
Localisation
Part #1: 
Part #2: 
Part #3: 
Part #4: 
Part #5: 
Part #6: 
Part #7: 
- Latitude: 52° 3' 29.6"
 - Longitude: 7° 18' 47.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #8: 
- Latitude: 52° 3' 29.6"
 - Longitude: 7° 18' 47.5"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 16 June 2025
Complete/correct this sheet: