[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Mullerup
- Commissioning:

- 2 turbines: Nordex N50/800 (power 800 kW, diameter 50 m)
- Hub height:

- Total nominal power: 1,600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 23.9 %
- Expected production: 9,160 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Mullerup
- Commissioning:

- 1 turbine: Nordex N50/800 (power 800 kW, diameter 50 m)
- Hub height:

- Total nominal power: 800 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, June 10 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 27 %
- Expected production: 5,180 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 23' 48.2"
- Longitude: 10° 39' 58.4"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 23' 48.2"
- Longitude: 10° 39' 58.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 26 April 2019
Complete/correct this sheet: