[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Borre
- Commissioning:

- 1 turbine: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 660 kW
- Operational
- Onshore wind farm
- Owner:

- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 17.9 %
- Expected production: 2,830 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Borre
- Commissioning:

- 4 turbines: Vestas V47/660 (power 660 kW, diameter 47 m)
- Hub height:

- Total nominal power: 2,640 kW
- Operational
- Onshore wind farm
- Owner:

- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 17.9 %
- Expected production: 11,310 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 38' 31.6"
- Longitude: 8° 19' 20.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 55° 38' 31.6"
- Longitude: 8° 19' 20.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 5 July 2018
Complete/correct this sheet: