[Back to previous page]
Generalities
|
|
Details
- Commissioning:

- 3 turbines: (manufacturer name not available)
- Total nominal power: 450 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 21.4 %
- Expected production: 2,310 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 55° 39' 2"
- Longitude: 8° 21' 33.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: