[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Maugstrup
- Commissioning:

- 1 turbine: Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 43.1 %
- Expected production: 6,210 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Maugstrup
- Commissioning:

- 1 turbine: Nordtank NTK600/43 (power 600 kW, diameter 43 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.5 %
- Expected production: 1,800 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Maugstrup
- Commissioning:

- 1 turbine: Wincon W600/45 (power 600 kW, diameter 45 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Source:

Production forecast
- From Saturday, September 23 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 30 %
- Expected production: 4,320 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 55° 17' 14.5"
- Longitude: 9° 20' 36.9"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 55° 17' 14.5"
- Longitude: 9° 20' 36.9"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Latitude: 55° 17' 14.5"
- Longitude: 9° 20' 36.9"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 21 September 2017
Complete/correct this sheet: