Wind farms
Floutrup (Denmark)| Floutrup (Denmark) |
|
| Operational (0,15 MW) - Dismantled (0,375 MW) |

| Country | Denmark |
| County/Zone | Skive (Midtjylland) |
| City | Floutrup |
| Wind farm type | Onshore wind farm |

![]() | 0.225 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.225 MW decommissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Nordtank 150XLR (x 1) |
| Dismantled | Vestas V27/225 (x 1) |
| Dismantled | Nordtank (x 1) |

![]() | |

| City | Floutrup |
| Commissioning | ![]() |
| Turbine | 1x Vestas V27/225 (power 225 kW, diameter 27 m) |
| Hub height | ![]() |
| Total nominal power | 225 kW |
| Status | Dismantled (2015/03) |
| Coordinates | Latitude 56° 47' 29.8" - Longitude 9° 4' 46.9" |
| Precise localization | No |
| City | Floutrup |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Operational |
| Coordinates | Latitude 56° 47' 29.8" - Longitude 9° 4' 46.9" |
| Precise localization | No |
| City | Floutrup |
| Commissioning | ![]() |
| Turbine | 1x Nordtank |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2016/04) |
| Coordinates | Latitude 56° 47' 29.8" - Longitude 9° 4' 46.9" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Selde (2 km) Junget (3 km) Lindum Vindmollepark (4 km) Lindum (4 km) Risum (4 km) Thorum (5 km) Torum (6 km) Asted (Skive) (6 km) Tondering (7 km) Myrhoj (8 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Skive (Midtjylland) : 139.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 September 2017 |
||