Part #1:
- City: Kalkar
- Commissioning:

- 1 turbine: Repower MD77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, February 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 53.6 %
- Expected production: 19,310 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Kalkar
- Commissioning:

- 1 turbine: Seewind S 52 750 (power 750 kW, diameter 52 m)
- Hub height:

- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, February 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 69.5 %
- Expected production: 12,510 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Kalkar
- Commissioning:

- 1 turbine: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:

- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Part #4:
- City: Kalkar
- Commissioning:

- 1 turbine: Nordex N117/2400 (power 2 400 kW, diameter 117 m)
- Hub height:

- Total nominal power: 2,400 kW
- Operational
- Onshore wind farm
Localisation
Part #1:
- Latitude: 51° 43' 59.1"
- Longitude: 6° 23' 1.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 43' 19.3"
- Longitude: 6° 22' 44.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 43' 19.3"
- Longitude: 6° 22' 44.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 43' 19.3"
- Longitude: 6° 22' 44.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 3 August 2022
Complete/correct this sheet: