[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Blender
- Commissioning:

- 3 turbines: Dewind D4 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, January 24 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 8.1 %
- Expected production: 3,510 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Blender
- Commissioning:

- 1 turbine: Dewind D4 (power 600 kW, diameter 48 m)
- Hub height:

- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Production forecast
- From Sunday, January 24 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 8.1 %
- Expected production: 1,170 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 54' 37"
- Longitude: 9° 7' 14"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 52° 54' 37"
- Longitude: 9° 7' 14"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: