Wind farms
Los Collados (Spain)| Los Collados (Spain) |
|
| Operational (11,69 MW) |
Have you noticed an error or do you have additional information about this wind farm? Feel free to report it.
Every contribution helps improve the quality and reliability of the database. Thank you for your help.
Databases ![]() Spain (52.7 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alto de la Degollada (6 km) Fuente Salada (6 km) El Carril (9 km) El Navazo Fase II (10 km) El Navazo Fase I (12 km) El Carril II (12 km) Valbonilla Fase II (13 km) Valbonilla Fase I (13 km) Carrasquillo (13 km) Los Zapateros (14 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Burgos (Castilla y Leon) : 2,389.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||