Wind farms
El Manzanal (Spain)| El Manzanal (Spain) |
|
| Operational (40,5 MW) |

| Coordinates | Latitude 42° 30' 0" - Longitude -6° 9' 36" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms El Pedrón (9 km) Argañoso (11 km) La Mallada (15 km) Valdelacasa (16 km) Peña del Gato (19 km) Valdelón Ampliación (21 km) Valdelón (21 km) El Redondal Fase 1 (22 km) El Redondal Fase 2 (22 km) Espina (24 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Leon (Castilla y Leon) : 454.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||