Wind farms
Sierra del Trigo (Fase I y II) (Spain)| Sierra del Trigo (Fase I y II) (Spain) |
|
| Operational (15,18 MW) |

| Coordinates | Latitude 37° 30' 47.2" - Longitude -3° 44' 27.7" |
| Precise localization | No |
Reserved for Premium Access
Databases ![]() Spain (52.7 GW) Europe (658.4 GW) World (2,459.0 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Cueva Dorada (53 km) Los Sillones (53 km) Mamut (55 km) Parque Eólico Experimental Cerros Pelaos (56 km) Valcaire (57 km) Padul (58 km) Loma del Capón (62 km) Lomas de Manteca (63 km) Lomas de Lecrin (63 km) Lecrin (64 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Jaén (Andalucía) : 15.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 27 November 2024 |
||