The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets. The Wind Power is a comprehensive database of detailed raw statistics on the rapidly growing sphere of wind energy and its supporting markets.
English English Deutsch Español 

Online access > Wind farms > Bad Wünnenberg (Germany)


[Back to previous page]

Germany wind farms file

 

General data

  Map  

Generalities

PDF

Details


Part #1:

  • Commissioning: 2004
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 2,600 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 22.9 %
  • Expected production: 14,280 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Wohlbedacht
  • Commissioning: 2001/08
  • 10 turbines: Enercon E66/2000 (power 2 000 kW, diameter 66 m)
  • Total nominal power: 20,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 15 %
  • Expected production: 72,010 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 15.9 %
  • Expected production: 20,630 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Eilerberg
  • Commissioning: 1998/11
  • 1 turbine: Vestas V47/660 (power 660 kW, diameter 47 m)
  • Total nominal power: 660 kW
  • Operational
  • Onshore wind farm
  • Developer: Energieteam

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 19.7 %
  • Expected production: 3,130 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Eilerberg
  • Commissioning: 2004/07
  • 2 turbines: Enercon E58/1000 (power 1 000 kW, diameter 58 m)
  • Hub height: 98 m
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 14.7 %
  • Expected production: 7,060 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #6:

  • City: Meerhof
  • Commissioning: 1995/08
  • 4 turbines: Enercon E58/1000 (power 1 000 kW, diameter 58 m)
  • Hub height: 98 m
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 22 %
  • Expected production: 21,150 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #7:

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 19.5 %
  • Expected production: 2,810 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #8:

  • City: Eilerberg
  • 7 turbines: Vestas V66/1750 (power 1 750 kW, diameter 66 m)
  • Hub height: 78 m
  • Total nominal power: 12,250 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 18.1 %
  • Expected production: 53,290 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #9:

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 22 %
  • Expected production: 35,690 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #10:

       Production forecast

  • From Friday, December 14 2018, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 22 %
  • Expected production: 120,290 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no

Part #10:

  • Latitude: 51° 31' 3.8"
  • Longitude: 8° 41' 51.5"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 18 October 2017
Complete/correct this sheet: