Wind farms
Otterndorf (Germany)| Otterndorf (Germany) |
|
| Operational (18 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Cuxhaven - Otterndorf |
| Wind farm type | Onshore wind farm |

![]() | 9 MW commissioned |
![]() | 8.4 MW commissioned |
![]() | 0.6 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E40/500 (x 18) |
| Operational | Bonus B44/600 (x 14) |
| Operational | Enercon E44/600 (x 1) |

![]() | |

| City | Cuxhaven |
| Commissioning | ![]() |
| Turbine | 1x Enercon E44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 600 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 53° 48' 28.1" - Longitude 8° 53' 55.3" |
| Precise localization | No |
| City | Otterndorf |
| Commissioning | ![]() |
| Turbines | 18x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 9,000 kW |
| Status | Operational |
| Coordinates | Latitude 53° 46' 37.4" - Longitude 8° 49' 19.4" |
| Precise localization | No |
| City | Otterndorf |
| Commissioning | ![]() |
| Turbines | 14x Bonus B44/600 (power 600 kW, diameter 44 m) |
| Hub height | ![]() |
| Total nominal power | 8,400 kW |
| Status | Operational |
| Coordinates | Latitude 53° 46' 43.2" - Longitude 8° 49' 13.3" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Nordleda (0 km) Wanna II (4 km) Wanna I (4 km) Emmelke (6 km) Neuenkirchen (Niedersachsen) (6 km) Altenbruch (7 km) Altenbruch II (8 km) Osterbruch (9 km) Belum (9 km) Bülkau (10 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 20 October 2022 |
||