Wind farms
Bassum Albringhausen (Germany)| Bassum Albringhausen (Germany) |
|
| Operational (37,1 MW) - Dismantled (10,5 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Diepholz |
| Wind farm type | Onshore wind farm |

![]() | 10.5 MW commissioned |
![]() | 37.1 MW commissioned |
![]() | 10.5 MW decommissioned |

| Developers |
![]() ![]() |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | GE Vernova 5.3-158 (x 7) |
| Dismantled | Enron 1.5s (x 7) |

![]() | |
![]() | |

| City | Diepholz |
| Commissioning | ![]() |
| Turbines | 7x Enron 1.5s (power 1,500 kW, diameter 70.5 m) |
| Hub height | ![]() |
| Total nominal power | 10,500 kW |
| Status | Dismantled |
| Developer | ![]() |
| Coordinates | Latitude 52° 47' 43.2" - Longitude 8° 47' 57.8" |
| Precise localization | Yes |
| Part | Nienstedt-Apelstedt-Schorlingborstel-Hallstedt |
| City | Diepholz |
| Commissioning | ![]() |
| Turbines | 7x GE Vernova 5.3-158 (power 5,300 kW, diameter 158 m) |
| Hub height | ![]() |
| Total nominal power | 37,100 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 52° 47' 49.1" - Longitude 8° 47' 9.3" |
| Precise localization | No |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Albringhausen Alt (1 km) Albringhausen II (1 km) Sudwalde (2 km) Schwaförden (5 km) Scholen (6 km) Klövenhausen (7 km) Wesenstedt (7 km) Twistringen (8 km) Scholen-Haaßel (8 km) Schwaförden II (8 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 December 2025 |
||