Wind farms
Werbig II (Germany)| Werbig II (Germany) |
|
| Operational (12,4 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Uckerland - Werbig |
| Wind farm type | Onshore wind farm |

![]() | 3 MW commissioned |
![]() | 4.7 MW commissioned |
![]() | 2.35 MW commissioned |
![]() | 2.35 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E92/2350 (x 4) |
| Operational | GE Vernova 1.5sl (x 2) |

![]() | |

| City | Werbig |
| Commissioning | ![]() |
| Turbine | 1x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 2,350 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 57' 14.6" - Longitude 13° 9' 25.2" |
| Localisation précise | Non |
| City | Werbig |
| Commissioning | ![]() |
| Turbine | 1x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 2,350 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 57' 6.8" - Longitude 13° 9' 42.5" |
| Localisation précise | Non |
| City | Uckerland |
| Commissioning | ![]() |
| Turbines | 2x GE Vernova 1.5sl (power 1,500 kW, diameter 77 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordonnées | Latitude 53° 31' 16.1" - Longitude 13° 49' 4.6" |
| Localisation précise | Non |
| Part | Niederer Fläming |
| City | Werbig |
| Commissioning | ![]() |
| Turbines | 2x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 4,700 kW |
| Status | Operational |
| Développeur | ![]() |
| Coordonnées | Latitude 51° 57' 20.4" - Longitude 13° 9' 27.7" |
| Localisation précise | Oui |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Werbig IV (0 km) Hohengörsdorf (0 km) Werbig (1 km) Markendorf (Brandenburg) (1 km) Jüterbog (2 km) Jüterborg (Börnickenberg) (3 km) Jüterborg II (4 km) Niederer Fläming (6 km) Waltersdorf (6 km) Welsickendorf (7 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Brandenburg : 10 012.1 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 9 novembre 2022 |
||