Küstenwind (Germany)| Küstenwind (Germany) |
|
| Operational (7,6 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Großheide - Nenndorf |
| Wind farm type | Onshore wind farm |

![]() | 3 MW commissioned |
![]() | 4.6 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E66/1500 (x 2) |
| Operational | Enercon E82/2300 (x 2) |

| No source available |

| City | Großheide |
| Commissioning | ![]() |
| Turbines | 2x Enercon E66/1500 (power 1,500 kW, diameter 66 m) |
| Hub height | ![]() |
| Total nominal power | 3,000 kW |
| Status | Operational |
| Coordonnées | Latitude 53° 36' 52.7" - Longitude 7° 25' 21.9" |
| Localisation précise | Non |
| City | Nenndorf |
| Commissioning | ![]() |
| Turbines | 2x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 4,600 kW |
| Status | Operational |
| Coordonnées | Latitude 53° 36' 40.1" - Longitude 7° 25' 26.3" |
| Localisation précise | Non |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Nenndorf (0 km) Grossheide (0 km) Großheide (1 km) Küstenwind IIKG (1 km) Arle (1 km) Dornum (2 km) Südermeedland (2 km) Westerholt (2 km) Roggenstede (2 km) Georgshof (3 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Niedersachsen : 15 027.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 6 septembre 2022 |
||