Wind farms
Nackel (Germany)| Nackel (Germany) |
|
| Operational (3,5 MW) |

| Country | Germany |
| County/Zone | Brandenburg |
| City | Nackel |
| Other name | Wusterhausen/Dosse |
| Wind farm type | Onshore wind farm |

![]() | 2.5 MW commissioned |
![]() | 1 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E40/500 (x 7) |

| No source available |

| Part | Wusterhausen/Dosse |
| City | Nackel |
| Commissioning | ![]() |
| Turbines | 5x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 2,500 kW |
| Status | Operational |
| Coordinates | Latitude 52° 50' 13.2" - Longitude 12° 33' 17.5" |
| Precise localization | Yes |
| Part | Wusterhausen/Dosse |
| City | Nackel |
| Commissioning | ![]() |
| Turbines | 2x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 1,000 kW |
| Status | Operational |
| Coordinates | Latitude 52° 50' 13.2" - Longitude 12° 33' 17.5" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Neustadt Dosse (4 km) Neustadt Süd Eins (5 km) Askov Overgaard (5 km) Bückwitz (5 km) Ganzer (5 km) Wildberg (Brandenburg) (5 km) Bückwitz II (6 km) Neustadt-Dosse (6 km) Dessow (6 km) Mechow (6 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Brandenburg : 10,012.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 7 June 2022 |
||