Wind farms
Südbrookmerland (Germany)| Südbrookmerland (Germany) |
|
| Operational (6,4 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Südbrookmerland |
| Wind farm type | Onshore wind farm |

![]() | 1 MW commissioned |
![]() | 5.4 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Enercon E66/1800 (x 3) |
| Operational | Enercon E40/500 (x 2) |

| No source available |

| City | Südbrookmerland |
| Commissioning | ![]() |
| Turbines | 2x Enercon E40/500 (power 500 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 1,000 kW |
| Status | Operational |
| Coordinates | Latitude 53° 28' 35.3" - Longitude 7° 22' 16.1" |
| Precise localization | No |
| Part | Oldeborg |
| City | Südbrookmerland |
| Commissioning | ![]() |
| Turbines | 3x Enercon E66/1800 (power 1,800 kW, diameter 66 m) |
| Hub height | ![]() |
| Total nominal power | 5,400 kW |
| Status | Operational |
| Coordinates | Latitude 53° 29' 25.9" - Longitude 7° 19' 55.6" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Gusszentrum Ostfriesland (3 km) Upgant-Schott (5 km) Groß Buschhaus (6 km) Mühle Extumer Moor (6 km) Mühle Halle (6 km) Leezdorf (6 km) Georgsfeld (7 km) Herrenhof (7 km) Soltenland (7 km) Wirdum (8 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Niedersachsen : 15 027.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 24 août 2022 |
||