Wind farms
Lindchen (Germany)| Lindchen (Germany) |
|
| Operational (13,7 MW) |

| Country | Germany |
| County/Zone | Nordrhein-Westfalen |
| City | Bedburg-Hau - Goch - Uedem |
| Wind farm type | Onshore wind farm |

![]() | 2 MW commissioned |
![]() | 1.2 MW commissioned |
![]() | 1.25 MW commissioned |
![]() | 2.3 MW commissioned |
![]() | 2.35 MW commissioned |
![]() | 2.3 MW commissioned |
![]() | 2.3 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E70/2300 (x 2) |
| Operational | Enercon E40/600 (x 2) |
| Operational | Dewind D6-1000 (x 2) |
| Operational | Dewind D6 (x 1) |
| Operational | Enercon E82/2300 (x 1) |
| Operational | Enercon E92/2350 (x 1) |

| No source available |

| City | Bedburg-Hau |
| Commissioning | ![]() |
| Turbine | 1x Enercon E70/2300 (power 2,300 kW, diameter 71 m) |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 43' 4.4" - Longitude 6° 13' 0.1" |
| Localisation précise | Non |
| City | Goch |
| Commissioning | ![]() |
| Turbine | 1x Enercon E70/2300 (power 2,300 kW, diameter 71 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 41' 21.7" - Longitude 6° 12' 42" |
| Localisation précise | Non |
| City | Bedburg-Hau |
| Commissioning | ![]() |
| Turbine | 1x Dewind D6 (power 1,250 kW, diameter 64.3 m) |
| Hub height | ![]() |
| Total nominal power | 1,250 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 42' 49.7" - Longitude 6° 13' 18.2" |
| Localisation précise | Non |
| City | Uedem |
| Commissioning | ![]() |
| Turbine | 1x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 42' 3.9" - Longitude 6° 15' 2.7" |
| Localisation précise | Non |
| City | Uedem |
| Commissioning | ![]() |
| Turbine | 1x Enercon E92/2350 (power 2,350 kW, diameter 92 m) |
| Hub height | ![]() |
| Total nominal power | 2,350 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 41' 57.2" - Longitude 6° 15' 19" |
| Localisation précise | Non |
| City | Bedburg-Hau |
| Commissioning | ![]() |
| Turbines | 2x Dewind D6-1000 (power 1,000 kW, diameter 62 m) |
| Hub height | ![]() |
| Total nominal power | 2,000 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 42' 54" - Longitude 6° 13' 13.9" |
| Localisation précise | Non |
| Part | Gut Heidhausen |
| City | Goch |
| Commissioning | ![]() |
| Turbines | 2x Enercon E40/600 (power 600 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Coordonnées | Latitude 51° 41' 21.7" - Longitude 6° 12' 42" |
| Localisation précise | Oui |
Bases de données ![]() Germany (104.2 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Rückenwind (1 km) Feldwind (2 km) Goch (2 km) Uedem (2 km) Keppeln (3 km) Weeze GbR (3 km) Weeze (3 km) Kalbeck (3 km) Neu-Louisendorf (6 km) Kalkar (6 km) | ||
|
Insights Puissance installée Germany : 77 691.0 MW (fin 2025) Nordrhein-Westfalen : 9 671.3 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 8 septembre 2022 |
||