Wind farms
Ringstedt (Germany)| Ringstedt (Germany) |
|
| Operational (15,6 MW) |

| Country | Germany |
| County/Zone | Niedersachsen |
| City | Ringstedt |
| Wind farm type | Onshore wind farm |

![]() | 4.8 MW commissioned |
![]() | 0.8 MW commissioned |
![]() | 10 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Enercon E48/800 (x 7) |
| Operational | Gamesa G80/2000 (x 5) |

| No source available |

| City | Ringstedt |
| Commissioning | ![]() |
| Turbine | 1x Enercon E48/800 (power 800 kW, diameter 48 m) |
| Hub height | ![]() |
| Total nominal power | 800 kW |
| Status | Operational |
| Coordinates | Latitude 53° 34' 2.1" - Longitude 8° 53' 12.6" |
| Precise localization | Yes |
| City | Ringstedt |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Hub height | ![]() |
| Total nominal power | 10,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 53° 34' 2.1" - Longitude 8° 53' 12.6" |
| Precise localization | Yes |
| City | Ringstedt |
| Commissioning | ![]() |
| Turbines | 6x Enercon E48/800 (power 800 kW, diameter 48 m) |
| Hub height | ![]() |
| Total nominal power | 4,800 kW |
| Status | Operational |
| Coordinates | Latitude 53° 34' 2.1" - Longitude 8° 53' 12.6" |
| Precise localization | Yes |
Databases ![]() Germany (104.2 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Köhlen (3 km) Wittgeeste (4 km) Kührstedt-Alfstedt (6 km) Ebersdorf (Niedersachsen) (8 km) Ebersdorf (9 km) Alfstedt (10 km) Lohe (Niedersachsen) (11 km) Sellstedt (11 km) Mittelstenahe (12 km) Oerel (12 km) | ||
|
Insights Production capacity Germany : 77,691.0 MW (end of 2025) Niedersachsen : 15,027.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 15 July 2022 |
||