Wind farms
Cabeço Alto (Portugal)| Cabeço Alto (Portugal) |
|
| Operational (11,7 MW) |

| Country | Portugal |
| County/Zone | Vila Real (Norte) |
| City | Montalegre |
| Wind farm type | Onshore wind farm |

![]() | 11.7 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| En fonctionnement | Nordex N60/1300 (x 9) |

![]() | |
![]() | |

| Hauteur nacelle | ![]() |
| Coordonnées | Latitude 41° 52' 24.3" - Longitude -7° 50' 19.4" |
| Localisation précise | Oui |
Bases de données ![]() Portugal (11.1 GW) Europe (656.6 GW) Monde (2451.9 GW) Tous les produits |
||
Résumé PDF
|
||
| Parcs voisins Terra Fria (11 km) Aguieira (11 km) Alto do Seixal (18 km) Serra do Larouco (18 km) Alturas do Barroso (18 km) Serra do Barroso II (20 km) Serra do Barroso (21 km) Serra do Leiranco (21 km) Serra do Barroso III (21 km) Leiranco (22 km) | ||
|
Insights Puissance installée Portugal : 5 990.0 MW (fin 2025) Vila Real (Norte) : 684.8 MW (*) |
||
|
Légende #ND : donnée non disponible (*) : selon la base de données The Wind Power |
||
|
Mise à jour de cette fiche 27 novembre 2025 |
||