Wind farms
Alto da Vaca (Portugal)| Alto da Vaca (Portugal) |
|
| Operational (2,4 MW) |

| Country | Portugal |
| County/Zone | Braga (Norte) |
| City | Vieira do Minho |
| Wind farm type | Onshore wind farm |

![]() | 1.2 MW commissioned |
![]() | 1.2 MW commissioned |

| Developers |
![]() ![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E40/600 (x 4) |

![]() | |
![]() | |

| Part | Cabeço de Vaca I |
| City | Vieira do Minho |
| Commissioning | ![]() |
| Turbines | 2x Enercon E40/600 (power 600 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Developers | /![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 39' 53.2" - Longitude -8° 5' 2.7" |
| Altitude | 950 m |
| Precise localization | Yes |
| Part | Cabeço de Vaca II |
| City | Vieira do Minho |
| Commissioning | ![]() |
| Turbines | 2x Enercon E40/600 (power 600 kW, diameter 40 m) |
| Hub height | ![]() |
| Total nominal power | 1,200 kW |
| Status | Operational |
| Developers | /![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 39' 53.2" - Longitude -8° 5' 2.7" |
| Altitude | 950 m |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (656.6 GW) World (2,451.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Ruivaes (0 km) Vilar Chão (3 km) Alto do Talefe (4 km) Serra da Cabreira (4 km) Lomba do Vale (10 km) Lomba Seixa (17 km) Serra do Barroso (18 km) Tâmega (19 km) Serra do Barroso III (20 km) Terras Altas Fafe (20 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Braga (Norte) : 457.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||