Details
Part #1:
Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 32.6 %
- Expected production: 93,820 kWh
- Values from Weathernews Windcaster solution
Part #2:
Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 29.9 %
- Expected production: 59,250 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Nossen
- Commissioning:

- 1 turbine: GE Energy 2.75-120 (power 2 750 kW, diameter 120 m)
- Hub height:

- Total nominal power: 2,750 kW
- Operational
- Onshore wind farm
- Operator: Envia
- Owner:

Production forecast
- From Thursday, July 07 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 55.4 %
- Expected production: 36,550 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Nossen
- Commissioning:

- 6 turbines: Neg Micon NM60/1000 (power 1 000 kW, diameter 60 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Energiequelle
- Operator: Envia
- Owner:

- Source:

Localisation
Part #1:
- Latitude: 51° 4' 59.6"
- Longitude: 13° 21' 27.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 5' 50.8"
- Longitude: 13° 21' 58.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 4' 14.1"
- Longitude: 13° 21' 19.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 4' 24.3"
- Longitude: 13° 21' 16.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view