[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Greven
- Commissioning:

- 3 turbines: Fuhrländer FL MD/77 (power 1 500 kW, diameter 77 m)
- Hub height:

- Total nominal power: 4,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 33.7 %
- Expected production: 36,370 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Greven
- Commissioning:

- 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
- Hub height:

- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, May 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 17.5 %
- Expected production: 2,100 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 52° 3' 15.7"
- Longitude: 7° 36' 3.7"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 52° 6' 29.9"
- Longitude: 7° 37' 10.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 7 September 2022
Complete/correct this sheet: