Generalities
|
|
Details
Part #1:
Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 42.4 %
- Expected production: 122,070 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Arnstein
- Commissioning:

- 3 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: PN Power Plants AG
- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.2 %
- Expected production: 17,500 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Arnstein
- Commissioning:

- 2 turbines: Enercon E92/2350 (power 2 350 kW, diameter 92 m)
- Hub height:

- Total nominal power: 4,700 kW
- Operational
- Onshore wind farm
- Developer: SAB WindTeam GmbH
- Source:

Production forecast
- From Wednesday, March 29 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15.6 %
- Expected production: 17,630 kWh
- Values from Weathernews Windcaster solution
Part #4:
- City: Arnstein
- Commissioning:

- 1 turbine: Enercon E101/3000 (power 3 000 kW, diameter 101 m)
- Hub height:

- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developer: SAB WindTeam GmbH
- Source:

Localisation
Part #1:
- Latitude: 51° 42' 45.6"
- Longitude: 11° 27' 50.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 43' 0.9"
- Longitude: 11° 27' 44.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 43' 13.7"
- Longitude: 11° 27' 30.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 43' 13.7"
- Longitude: 11° 27' 30.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 4 November 2022