[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Herl
- Commissioning:

- 5 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: Juwi
- Owner:

Production forecast
- From Monday, September 25 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.7 %
- Expected production: 1,610 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Herl
- Commissioning:

- 5 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
- Developer: Juwi
- Owner:

Production forecast
- From Monday, September 25 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0.5 %
- Expected production: 1,240 kWh
- Values from Weathernews Windcaster solution
Part #3:
- City: Naurath
- Commissioning:

- 1 turbine: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Owner:

Localisation
Part #1:
- Latitude: 49° 45' 19.1"
- Longitude: 6° 51' 24.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 49° 45' 19.1"
- Longitude: 6° 51' 24.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 49° 45' 4.3"
- Longitude: 6° 52' 27"
- Altitude: 400 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 8 July 2022
Complete/correct this sheet: